Customer-Specific Requirements Live in Somebody's Inbox
The quality system is managed properly. The OEM's own flowdowns are managed by whoever answered the last customer audit, from memory.
The sector that industrialized quality planning. Nowhere else is so much of the work required to happen before the first good part, and nowhere else is the paperwork for it so completely specified.
The Shape of It
The standard is the smaller half of the problem. Customer-specific requirements sit on top of the quality system, differ by OEM, and change on their own schedules — so a supplier can be fully conformant to its own system and still fail a customer audit.
Most of what a customer audits is planned before the first good part. The core tools — APQP, PPAP, FMEA, MSA, and SPC — are where a supplier wins or loses the business, long before a certificate is checked.
What Applies
The working set, not an exhaustive register. Each row prints the body that issues it, so nothing here depends on the color of the rule beside it. Customer-specific requirements sit on top of all of it and are frequently where the real work is.
The Base Standard. The 2026 edition was published on September 16, 2026, with transition by September 30, 2029; the base every automotive quality system is built on.
Advanced Product Quality Planning. The phase gates a part passes through before it is allowed to go to volume.
Production Part Approval. Eighteen elements, five submission levels, and no shipping until the customer accepts it.
Failure Mode and Effects Analysis. Design and process, on the harmonized handbook that replaced the two separate methods.
Measurement Systems Analysis. Gauge R&R — proving the measurement before trusting anything measured with it.
Statistical Process Control. The joint AIAG & VDA manual, 1st edition, went on sale in July 2026; customers set the date their suppliers must adopt it. Control charts and capability, with a sampling plan that justifies them.
Process Audit. Expected by German OEMs and their tiers, and scored on a different basis from a system audit.
Every standard above has a page and a free brief on QES letterhead, with its status as checked on October 24, 2026. Browse Standards & Guidance.
In Practice
Not statistics — QES's own reading of where these systems are most often found short, from thirty years of building and auditing them.
The quality system is managed properly. The OEM's own flowdowns are managed by whoever answered the last customer audit, from memory.
A process change three years later never triggered a re-submission, because nobody owned the question of what counts as a change.
Severity, occurrence and detection are exactly as they were written for the approval, though the process, the tooling and the supplier have all changed since.
A Real-World Case
The Takata inflator recalls cover tens of millions of US vehicles, and the criminal case that followed turned on test data.
Sources. NHTSA — Takata recall spotlight (opens in a new tab); NPR, via Texas Public Radio — Takata to pay $1 billion over air bag fraud (January 13, 2017) (opens in a new tab). A public case, summarized from the official findings and reporting cited; QES was not involved in it. Figures are quoted as published. Checked October 24, 2026.
Where to Start
A fixed-price gap assessment — two days on your floor and in your files, from $4,200 — produces a clause-by-clause table: what you have, what the standard in your column actually requires, what is missing, and what has to be written — with an owner and a date against each line. You keep the findings whether or not you engage further.
On This Page. The standards listed are the working set an auditor is most likely to open, not an exhaustive register. Dated statements are sourced on the research page. The experience described is drawn from Marcia Weeden's employment record and is available in full on her résumé. Canceled military specifications are marked as canceled where they are still cited in contract flowdowns. Checked October 24, 2026.